"The Pulldown" Cinema & Performance Centre
>Project Introduction
As a final culmination of all the previous pre-design studies, site analysis & design exploration, this project tasks us students with composing the final Urban Room architectural project in the site of Jalan Raja Laut, Chow Kit. The Urban room project, ideally, is one which contributes to the local community socially, culturally and/or economically. No limitations on programs and spatial requirements were provided, allowing us students to fully express our own design.
​
I decided to tackle the idea of a cinema-based Urban Room project, with the goal of slowing down the working transiting users of the site, to reinvigorate to the site's stagnant community through film. Creating this cultural beacon would therefore also contribute to the local economy and culture of the site.
>Presentation Slides
This compilation of raw presentation slides explains the project in its entirety, and includes diagrams as well as transition slides. Further details are elaborated on in the Final Report & Presentation board below.
>Final Design Report
The final design report is a full A3 summary report including all site analysis and design exploration, laid out in order and explained as a comprehensive project explanation in full detail.
>Presentation Boards
A composition of 5A0 boards are used to show all architectural drawings & renderings of the final project outcome, including diagrams explaining narrative & concepts.